BSI 041 Rubble Foundations
A membrane capillary break was installed between the top of the rubble wall and the timber frame Photograph 4 Foam Bathtub—Extruded polystyrene foam on top of a gravel layer on top of the existing combination dirt and broken concrete slab floor The perimeter drain was located in the space between the foam bathtub and the perimeter